Last May 3-16 (May 3-5 for Cebu Branch Office & May 6-8 for Iligan Branch Office), Ekin Proje of Qatar interviewed workers of different skills for their airport expansion project of the Doha International Airport.
Project |
: New Doha International Airport Passenger Terminal Building |
|
|
Owner |
: NDIA Steering Committee (Qatar Airways) |
Main Contractor |
: SKY ORYX Joint Venture (Taisei / Japan – TAV / Turkey) |
Contractor |
: Akin Is? & Ekin Ortak Girisimi |
Total working area |
: Terminal – 220.000 m² |
Started At |
: March – 2005 |
Cooling Load |
: 32.415 KW (Main Terminal 19.613 kW, Concourse A 6.237 kW, Concourse B 6.565 kW) |
Total Duct Quantity |
: 100.000 m² Rectangular Air Duct |
Total Pipe Quantity |
: 110.000 m Black Steel Pipe, 1.600 m Galvanized Pipe, 200 m Ductile Iron Pipe,
37.500 m Cast Iron Pipe, 40.000 m Copper Tube |
Cooling System |
: 548 units of VAV, 370 units of FCU and Condensing Circulation Pump. |
Air Conditioning System |
: 75 units of AHU, 10 units of exhaust filter, 8 units of smoke exhaust fan, 7.249 units of grills,
133 Acoustic Silencers, 181 ea Auto. Air Ventilation Unit |
Fire System |
: 20.800 fire sprinklers, 320 units of fire extinguishers and Fire Hose Cabinets,
73 Alarm Check Valves, 520 units of FD, 391 units of FSD. |
Sanitary Systems |
: 552 Water Closets, 204 Urinals, 133 Showers, 66 Mop Sinks, 133 Electronic Cooler and Hair Dryer,
631 Counter Mounted Lavatory, 100 Bides, 390 Ablution Faucets and Hose. |
Rain & Waste Water System |
: 57 pieces Area Drain, 449 pieces Cleanout, 75 pieces Electrical Water Heater,
230 pieces Floor Cleanout, 888 pieces Floor Drain and Floor Sink, 21 pieces Oil Interceptor,
40 pieces Wall Cleanout, 80 m Storm Drain. |
Automation System |
: Building Management System with 3.000 locations |
General Information |
: Total project value 825.000.000 USD. |
Ekin Proje interviewed Instrument Fitters, Duct Fabricators, Duct Fitters, Plumbers, Insulators, Millwrights, Mechanical Foreman and selected 150 workers in the Cebu interview and 245 workers in the Iligan interview.
Ekin Proje is an accredited employer of RRJM International Manpower Services, Inc. and is registered at the Philippine Overseas Employment Administration.
RRJM International Manpower Services, Inc. is a licensed manpower agency by the Philippine Overseas Employment Administration.
For possible future job openings, post your resume at http://apply.rrjm.com.